Skip to Content

Sumitomo-Factory – VRV Air Conditioning Project

The Sumitomo Factory Project, developed for SUMITOMO, involved the Installation of Daikin VRV Air Conditioning Systems to provide a reliable, energy-efficient, and high-performance climate control solution tailored to the operational requirements of the manufacturing facility.

Progress Engineering Co. successfully executed the installation with a strong commitment to engineering excellence, precision, and quality. The Daikin VRV system was installed in accordance with the highest industry standards, ensuring optimal indoor comfort, stable environmental conditions, and dependable long-term performance throughout the facility.

This project demonstrates our expertise in delivering advanced VRV solutions for industrial facilities, combining innovative HVAC technology with professional execution to achieve maximum efficiency, reliability, and client satisfaction.